![]() ![]() The fallen sections of the existing walls will be replaced with a precast reinforced concrete wall, and the repaired wall sections will be reconstructed with concrete rubble masonry. Roughly 900-feet of the drainage canal wall between the ‘Ewa-side Japanese Pond and tennis courts will be repaired or replaced, including the portion that collapsed in 2016. ![]() HONOLULU – A Capital Improvement Project to repair the damaged drainage canal walls and replace two pedestrian bridges over the drainage canal at Ala Moana Regional Park began this week. ![]() 18, 2020 Project to repair canal walls and replace bridges at Ala Moana Regional Park Wider pedestrian bridges near Queen and Pi‘ikoi streets to align with existing Ala Moana Blvd. These should be completely restored for public use very soon.įriday, Dec. The pedestrian bridge widening project on the mauka-side of the park and Magic Island retaining wall & walkway improvement projects are the 2 efforts which just finished their landscape maintenance period. The Japanese Pond project (the tidal pond on the Kewalo-side) is near completion, and we are working on a few remaining items with the contractor. The project to repair the concrete decking for the bridle bridge (the double rainbow bridge near the bus stop) is awaiting the notice to proceed for the contractor. This includes Mayor’s Office of Culture and the Arts efforts to restore the murals and mosaics inside the portico as well as: structural improvements like repairing cracks, providing accessible restrooms installing a new fire alarm system, replacing the electrical panels, removal of tree roots in the two passage ways, adding new air-conditioning and new roofing for the two lower roofs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |